PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing motorized dampers at the 4th floor Facing East.jpg Installing sheathing along the parapet at the West Elevation.jpg Installing control valves at the 1st floor VAV Boxes Facing South.jpg Installing the Centrifugal system at the 1st floor  Sprinkler Room Facing East.jpg Laying out block at the 1st floor Interlock Room Facing South.jpg Started installing elevator guide rails at Elev. 1,2,3 Facing West.jpg Started waterproofing the Stair -2-Elev. 4  shear wall at the South Elevation.jpg
Previous pageNext page Laying out block at the 1st floor Interlock Room Facing South
Laying out block at the 1st floor Interlock Room Facing South